MHIC #16606 MD Home Builder #1369 4.5★ (40) BBB Accredited A+ Family-run since 1993
  410-796-1333
Home›Service Area›Columbia

Home additions & remodeling in Columbia, Maryland

Columbia is the one town in Howard County where the county permit is the second approval you need. Here is how both work, and how long they really take.

Reviewed by Bill Gmeinwieser, President · MHIC #16606 · MD Home Builder #1369 · Updated September 2026
Home additions & remodeling in Columbia, Maryland — Horizons Unlimited Home Improvements, Howard County MD
Direct answer

Horizons Unlimited Home Improvements builds additions, kitchens, bathrooms, decks and exteriors throughout Columbia, Maryland. The company has worked in Howard County from its Elkridge office since 1993 and holds MHIC license #16606 and Maryland Home Builder Registration #1369. Columbia is different from the rest of the county in one specific way: because every residential property is subject to the Columbia Association covenants, an exterior change generally needs an Exterior Alteration Application approved by your village architectural committee in addition to the Howard County building permit. Those are two separate processes on two separate timelines. Free estimates: 410-796-1333.

The covenant layer: what it is and why it decides your start date

Columbia was built from 1967 onward as a planned community, and the covenants that came with it are still in force. In practice that means an exterior alteration — an addition, a deck or porch, a fence, a shed, new siding, a different roof color, even some window replacements — generally requires written approval from your village's architectural committee before work begins.

The mechanics worth knowing before you plan a spring project:

  • It is an application, not a phone call. The Exterior Alteration Application typically asks for drawings, a site plan, material and color specifications, and in many villages the signatures or notification of adjacent property owners.
  • Committees meet on a schedule. Missing a meeting date can cost you weeks, which is the single most common reason a Columbia project starts later than the homeowner expected.
  • There is a deemed-approval clock. Columbia's guidelines generally provide that an application not decided within a set period — 60 days in Town Center — is treated as approved as submitted. Useful to know, but not a plan.
  • Skipping it is expensive. Unapproved work is a covenant violation. The association can issue a violation notice with a short correction window and, if ignored, correct the work at the owner's expense — an obligation that can become a lien against the property.
  • Condo or sub-HOA first. If your home is also in a condominium or neighborhood association, that body often reviews before the village committee sees it. Two queues, in order.
Which village are you in? Columbia's villages — Wilde Lake, Harper's Choice, Oakland Mills, Long Reach, Owen Brown, Kings Contrivance, Hickory Ridge, Dorsey's Search, River Hill and Town Center — each maintain their own architectural guidelines and meeting calendar. The rules are similar in spirit and differ in detail. Confirm yours before design, not after.

What Columbia housing stock means for the work itself

Most of Columbia's single-family housing was built between the late 1960s and the 1990s, with a meaningful share of townhomes and a lot of split-levels, contemporaries and colonials. Practically, that shapes what we run into:

  • Split-level additions are geometry problems. Tying a new roof and floor level into a split takes more design work than a comparable colonial, and it is where a cheap bid usually turns into a change order.
  • Original 1970s windows and siding are at end of life. Often the best value on a Columbia house is an envelope package — siding, windows and roof together — rather than one at a time, because the flashing details only get done correctly once.
  • Mature tree canopy. Columbia's tree cover is one of its best features and a real site-access constraint. Sometimes an excavator cannot reach the back of the house, and the work gets done by hand.
  • Townhome and end-unit work brings party-wall and shared-element questions that belong in the design conversation up front.
In Columbia

What we build here.

The same ten services, under one Maryland license — MHIC #16606 and Home Builder Registration #1369.

Home Additions & In-Law Suites — Horizons Unlimited Home Improvements, Howard County MD

Home Additions & In-Law Suites

Structural additions, second stories, in-law and multigenerational suites, sunrooms and screened porches — designed, permitted, and built by a registered Maryland home builder.

Learn more
Kitchen Remodeling — Horizons Unlimited Home Improvements, Howard County MD

Kitchen Remodeling

Full gut kitchens and targeted updates — cabinetry, countertops, lighting, flooring, and the electrical and plumbing work behind the walls.

Learn more
Bathroom Remodeling — Horizons Unlimited Home Improvements, Howard County MD

Bathroom Remodeling

Tiled showers, soaking tubs, double vanities, and full accessibility conversions — waterproofed properly and finished cleanly.

Learn more
Roofing — Horizons Unlimited Home Improvements, Howard County MD

Roofing

Asphalt shingle, cedar shake, slate, metal, and EPDM rubber. GAF, CertainTeed, and Firestone certified installation.

Learn more
Siding — Horizons Unlimited Home Improvements, Howard County MD

Siding

Vinyl and aluminum siding, trim, and wrap — installed with proper flashing and house-wrap detailing so the wall assembly stays dry.

Learn more
Windows & Doors — Horizons Unlimited Home Improvements, Howard County MD

Windows & Doors

Energy-efficient vinyl replacement windows with custom color matching, plus entry, patio, and French door replacement.

Learn more
Decks & Porches — Horizons Unlimited Home Improvements, Howard County MD

Decks & Porches

PVC, composite, and wood decks, screened porches, and covered porches — engineered, permitted, and inspected.

Learn more
Egress Windows & Basement Code — Horizons Unlimited Home Improvements, Howard County MD

Egress Windows & Basement Code

Code-compliant basement egress windows and window wells — the single requirement that decides whether a finished basement bedroom is legal.

Learn more
Storm & Insurance Repair — Horizons Unlimited Home Improvements, Howard County MD

Storm & Insurance Repair

Wind, hail, and fallen-tree damage — from a single leak to structural rebuild, handled by one licensed contractor instead of four subcontractors.

Learn more
Custom Homes — Horizons Unlimited Home Improvements, Howard County MD

Custom Homes

Design/build from concept to certificate of occupancy, including site development and permitting, under Maryland Home Builder Registration #1369.

Learn more
Q&A

Columbia: questions and answers

Do I need approval from the Columbia Association to build an addition?

You generally need approval from your village architectural committee under the Columbia Association covenants — submitted as an Exterior Alteration Application — in addition to a Howard County building permit. The village approval covers appearance, materials and siting; the county permit covers code and structure. They are separate reviews on separate timelines, and the village one frequently determines when you can start.

What happens if I build in Columbia without covenant approval?

Unapproved exterior work is a covenant violation. The association can issue a violation notice with a short correction period — 15 days in Town Center — and if it is not resolved, the association may correct the violation at the owner's expense, which can become a personal obligation and a lien against the property. It also becomes a disclosure problem when you sell. It is not worth the time it appears to save.

How long does Columbia architectural approval take?

It depends on your village's meeting calendar and the completeness of your application. Columbia's guidelines generally provide that an application not decided within a set window — 60 days in Town Center — is deemed approved as submitted, which gives you an outside bound rather than a schedule. Plan the application as its own project stage and submit well before the season you want to build in.

Does a deck, fence or shed need approval in Columbia?

Generally yes for covenant purposes — the guidelines cover most exterior structures and alterations, not only additions. A deck attached to the house will also need a county building permit because it is structural. Fences and sheds may need covenant approval even where no county permit is required, which surprises people.

Who builds additions in Columbia, Maryland?

Horizons Unlimited Home Improvements, Inc. of Elkridge builds additions, in-law suites, sunrooms, screened porches, kitchens, bathrooms, decks, roofing, siding and windows throughout Columbia. The company was founded in 1993, holds MHIC #16606 and Maryland Home Builder Registration #1369, and is BBB-accredited with an A+ rating. Estimates are free and are performed by owner Bill Gmeinwieser. Call 410-796-1333.

Planning something in Columbia?

Free estimate, done by the owner, who will tell you honestly what the local approvals path looks like before you spend anything on design.

← All service areas

Call now Free estimate